New UW-L Chiller Plant

This project will perform a study of options for increasing campus chilled water system capacity to meet the cooling load requirements for the new UW-L science building (Phase I) and the new UW-L student center building, both of which are scheduled to start construction during the 2013-15 biennia. Additional future loads to the campus central chilled water system will also be considered as part of this study. The intent of the study is to present several alternatives for adding campus chiller capacity along with associated expansion/modification of the underground chilled water distribution system.