Information Technology Services

Expand page menu
Skip to page menu

Classroom technology upgrades are done to replace aging technology in general access classrooms. If the technology in a classroom is 5 years or older, Academic Technology Services places that room in a list for a future upgrade. During the upgrade process, we will always contact the representing Dean of that space to see if changes are needed or to keep the function of the classroom the same. It is always advantageous for a faculty member to make suggestions either to your Dean or to Academic Technology Services in the ITS department at any time, if you would like to see a technology change in your classroom. 

Departmental space upgrades must be funded by the requesting department. ATS will assist with design, required equipment and installation for your request. You can make your request through the Eagle Help Desk or contact Mark Valenti, Assistant Director of Academic Technology Services at mvalenti@uwlax.edu. We will guide and work with you through the process. Additionally, we may have equipment that can be repurposed and save substantial cost with your project.

Graff 228- Conference Room- Collaboration-Summer 2016

Graff Main Hall 228 will be converted into an Administrative conference room. The room will have multiple laptop connections located in the conference table, a ceiling mounted projector, ceiling recessed screen, and teleconference phone.

View GMH 228 in Classroom Directory

Morris 165- General Access Classroom- Collaboration-Summer 2016

Morris 165 will be upgraded this summer.  Facilities will be replacing the temporary partition between classrooms 165 & 175 with a permanent wall, thereby eliminating the sound transmission and scheduling  issues.  In the process, we will be updating the technology in the classroom including a new instructor’s station, all-in-one computer system, collaboration stations, and control system. 

View MRS 165 in Classroom Directory

Centennial 3212- SOE Learning Studio-Summer 2016

The Centennial 3212 Innovation room will be updated to accommodate the School of Education Learning Studio.  The SOE Learning Studio is a collaboration and teaching environment that aims to improve technological literacy through an integrated approach whereby instructors model, teach, and reinforce effective uses of educational technolgoy, and students routinely use educational technology strategically for teaching and learning throughout their program of study.

View CNT 3212 in Classroom Directory

Wing 26

Wing 26 will be getting a small AV update to include a Large Screen display with Auto Switching abilities between multiple laptop connections.

View WNG026 in Classroom Directory

Centennial 1200- Conference Room-Summer 2016

The Centennial 1200 conference room will be updated to make the space more accessible by removing the large lectern and resizing tables to allow ADA access to all areas.  This will also include updating the AV system, including new display and control system and will place most of the devices on the wall in order to create a more aesthetically pleasing look.

View CNT 1200 in Classroom Directory

Center for the Arts 058- Department Lab-May 2016

Center for the Arts 058 will be upgraded this summer.  In the process, we will be updating the technology in the classroom including a new instructor’s station, all-in-one iMac computer system, projector, and control system.  Even though the technology is being replaced and upgraded, the room will provide the same functionality as it did previously.

View CFA 058 in Classroom Directory

Center for the Arts 116-General Access-Summer 2015

The Center for the Arts 116 classroom was upgraded during the summer of 2015.  In the process, we  converted the space to a dual projection classroom and in so doing eliminated the need for the 35mm slide projection.  We also updated the technology in the classroom including a new computer system, dual projectors, additional support speakers, and touchscreen control system.

View CFA 116 in Classroom Directory

Cleary 153 Great Hall- General Access-Summer 2016

Cleary 153 (Great Hall) will receive a ceiling renovation this summer which will include new lighting and shading improvements.  These will be tied into the current AV control system. 

View CLY 153 in Classroom Directory

Eagle Rec Conference Room

Eagle Rec conference room was updated to include a Large Screen Display switching abilities between Installed Television, PC and Laptop Connections.  System also has Videoconferencing abilities using Cisco Jabber and WebEx.  Painting and Furniture updates were also included with this project.

Eagle Rec Gymnasium Sound System

Eagle Rec Gymnasium Sound System was updated to a Multi-Zone sound system to include Background Music, Emergency Paging and Wireless Microphone abilities.  System consist of New large format loud speakers, Touch Panel control and CobraNet Networked Audio to be expandable to the new Eagle Rec Addition. 

Morris 105- Department Learning Lab-May 2016

Morris 105 will be upgraded this summer.  In the process, we will be updating the technology in the classroom including a new instructor’s station, all-in-one iMac computer system, projector, SMARTboard, and control system.  Even though the technology is being replaced and upgraded, the room will provide the same functionality as it did previously.

View MRS 105 in Classroom Directory

Morris 335 Conference Room

Morris 335 conference room was updated to include a Large Screen Display with auto switching abilities between Installed PC and Laptop Connections.  System also has Videoconferencing abilities using Cisco Jabber and WebEx. 

View MRS 335 in Classroom Directory

Wimberly 114- General Access Classroom- Summer 2016

Wimberly Hall 114 will be upgraded this summer.  This classroom will be undergoing an asbestos abatement and other cosmetic renovations.  In the process, we will be updating the technology in the classroom including a new instructor’s station, all-in-one computer system, projector, screen, and control system.  Even though the technology is being replaced and upgraded, the room will provide the same functionality as it did previously.

View CWH 114 in Classroom Directory

Wimberly 118- General Access Classroom-Summer 2016

Wimberly Hall 118 will be upgraded this summer.  This classroom will be undergoing an asbestos abatement and other cosmetic renovations.  In the process, we will be updating the technology in the classroom including a new instructor’s station, all-in-one computer system, projector, screen, and control system.  Even though the technology is being replaced and upgraded, the room will provide the same functionality as it did previously.

Wimberly 118 has a SMARTboard that will be replaced with a standard projection screen and projector.  We have received feedback from faculty who have requested that the SMARTboard be removed due to lack of need and use.

View CWH 118 in Classroom Directory

Wimberly 137- General Access Classroom-Summer 2016

Wimberly Hall 137 will be upgraded this summer.  This classroom will be undergoing an asbestos abatement and other cosmetic renovations.  In the process, we will be updating the technology in the classroom including a new instructor’s station, all-in-one computer system, projector, screen, and control system.  Even though the technology is being replaced and upgraded, the room will provide the same functionality as it did previously.

View CWH 137 in Classroom Directory

Wimberly 142- General Access Classroom-Summer 2016

Wimberly Hall 142 will be upgraded this summer.  This classroom will be undergoing an asbestos abatement and other cosmetic renovations.  In the process, we will be updating the technology in the classroom including a new instructor’s station, all-in-one computer system, projector, screen, and control system.  Even though the technology is being replaced and upgraded, the room will provide the same functionality as it did previously.

View CWH 142 in Classroom Directory

Wimberly 143- General Access Classroom-Summer 2016

Wimberly Hall 143 will be upgraded this summer.  This classroom will be undergoing an asbestos abatement and other cosmetic renovations.  In the process, we will be updating the technology in the classroom including a new instructor’s station, all-in-one computer system, projector, screen, and control system.  Even though the technology is being replaced and upgraded, the room will provide the same functionality as it did previously.

View CWH 143 in Classroom Directory

Wimberly 335- General Access Classroom-Summer 2016

Wimberly Hall 335 will be upgraded this summer.  This classroom will be undergoing an asbestos abatement and other cosmetic renovations.  In the process, we will be updating the technology in the classroom including a new instructor’s station, all-in-one computer system, projector, screen, and control system.  Even though the technology is being replaced and upgraded, the room will provide the same functionality as it did previously.

View CWH 335 in Classroom Directory

Graff Main Hall 260 (Brian and Lori Hesprich Auditorium)-Summer 2014

The Graff Main 260 auditorium was renovated during the summer of 2014 as a state funded project.  The auditorium was completely refurbished with careful detail paid to restoring and maintaining the distinctive architecture but also including modern technologies including LED lighting, surround sound audio, and Full HD projection.

View GMH 260 in Classroom Directory