Skip to main content

Accessibility menu

Skip to main content Skip to footer

Pre-design study

A page within Wittich Hall CBA Renovation

  • Wittich Hall Facility Study - November 10, 2014
  • Wittich Hall Renovation DRAFT 10% Concept Design Report Nov. 1, 2016 
    • Appendix 1 - Historic Structure Report
    • Appendix 2 - Preservation Plan
    • Appendix 3 - Facility Condition Assessment
    • Appendix 4 - Room Data Sheets
  • Wisconsin Historical Society Review Presentation - January 5, 2017
  • Wittich Hall Presentation-CBA All College Meeting, January 19, 2017