Pre-design study
A page within Wittich Hall CBA Renovation
- Wittich Hall Facility Study - November 10, 2014
- Wittich Hall Renovation DRAFT 10% Concept Design Report Nov. 1, 2016
- Appendix 1 - Historic Structure Report
- Appendix 2 - Preservation Plan
- Appendix 3 - Facility Condition Assessment
- Appendix 4 - Room Data Sheets
- Wisconsin Historical Society Review Presentation - January 5, 2017
- Wittich Hall Presentation-CBA All College Meeting, January 19, 2017